2D Parameter Plot Change Range Fail


Version: 2019b

Type: Bug Fixes

Category: Graphing

Subcategory: Specialized

Jira: ORG-19565


1.New 2D Parameter Plot, set X(t) = t,Y(t) = t. Click OK. A worksheet FUNC1 is created.
2.New a graph, drag and drop col(B) to the graph.
3.Double click the plot, change To to 4. Click OK.
==> Double click on the plot, the To is changed to 10.
Fixed in 2019b.